Commercial Roofing in Lansing: Preserving the Michigan State Capitol’s Beautiful Exterior

YEAR COMPLETED: 2007, 2013, 2014 ROOF AREA UPDATED: 8,000 Sq. Ft. TYPE OF SYSTEM: 90-Mil Adhered EPDM Since 1879, Michigan’s beautiful and historic State Capitol Building has served as the headquarters for the Michigan state government. Designated as a National Historic Landmark in 1992, the building has become renowned for its intricate, beautiful Italianite design, […]

Commercial Roofing For Meijer’s Distribution Facility Near Dayton, Ohio

YEAR COMPLETED: 2012, 2013 ROOF AREA UPDATED: 255,394 Sq. Ft. TYPE OF SYSTEM: Adhered TPO Meijer, Inc. is one of the largest supermarket chains in North America with more than 200 locations spread throughout the U.S. In 2012 and 2013, Bloom Roofing worked with Meijer to replace an Adhered TPO roofing system on the company’s […]

Minimizing Commercial Roofing Downtime for UPS in Maumee, Ohio

YEAR COMPLETED: 2010 ROOF AREA UPDATED: 288,761 Sq. Ft. TYPE OF SYSTEM: 60-Mil Mechanically-Fastened EPDM The United Parcel Service facility in Maumee, Ohio serves as a vital center for the company’s Midwest distribution and logistics. As one of the largest employers in Maumee, the UPS hub is open for 24 hours a day, 365 days a year. […]

Roofing Kraft’s Manufacturing Center With 100% Protection

YEAR COMPLETED: 2007 ROOF AREA UPDATED: 8,000 Sq. Ft. TYPE OF SYSTEM: 60-Mil Adhered EPDM Since 1934, Kraft Foods has used their Kendallville, Indiana facility as the company’s North American headquarters for product manufacturing, packaging, and distribution. In 2007, six separate roof areas spanning across more than 100,000 square feet required replacement, including certain areas directly above Kraft’s food […]

Commercial Roofing Case Study: Somerset Mall in Troy

Bloom has been the commercial roofing partner for Troy’s Somerset Collection Shopping Mall for nearly two decades. In 1995, Bloom was selected to facilitate the commercial roof replacement for the north wing of the mall – a new addition to the Somerset campus. After completing the construction with great success, Bloom was selected by Somerset’s management again in […]

Case Study: School District Saves $400,000 With Roof Restoration

In 1983, Hawthorne Elementary in Vernon Hills, Ill. installed a ballasted EPDM roofing system under the advice of a commercial roofing consultant. Towards the end of the roof’s projected lifespan, 21 years later, the same roofing consultant inspected the roof to determine if it needed to be replaced. The results were surprising. No roof leaks […]